CNC Machining Tolerances

What we hold as standard, what costs extra, and how to put tolerances on your drawing without paying for precision the part does not need.

The short answer

Three numbers cover almost every job we quote.

Dimensions without a tolerance callout follow ISO 2768-m. Dimensions you mark as critical are held to ±0.01 mm. ±0.005 mm is achievable where the geometry and material allow, and we will tell you plainly if a feature cannot take it.

Anything tighter is quoted rather than assumed. If a feature genuinely needs ±0.002 mm, that is a grinding conversation, not a milling one — and it is far cheaper to say so at quote stage than to find out on the CMM.

Tolerance capability

What the shop holds routinely, and what needs a conversation before we quote it.

General tolerance

ISO 2768-m

Applies to every dimension that has no tolerance of its own. See the chart below for the actual numbers.

Critical features

±0.01 mm

Held on the dimensions you mark as functional. This is the number most parts actually need.

High precision

±0.005 mm

Where geometry and material allow — shallow cuts, stable material, and a feature the tool reaches without deflection.

As-milled finish

Ra 1.6 – 3.2 µm

Standard for milling. Turning runs Ra 0.8 – 1.6 µm. Finer than that is a separate finishing pass.

Form and position

To your callout

Flatness, perpendicularity and position are quoted against the GD&T on your drawing. With no callout, ISO 2768-2 applies.

Before shipment

Checked to drawing

Every part is inspected against your drawing. Dimensional reports and material certificates on request.

ISO 2768-m tolerance chart

Linear dimensions, ISO 2768-1. A dimension only uses one of these values when the drawing gives it no tolerance of its own.

Nominal size (mm) ISO 2768-f (fine) ISO 2768-m (our default) ISO 2768-c (coarse)
0.5 – 3 ±0.05 mm ±0.1 mm ±0.2 mm
3 – 6 ±0.05 mm ±0.1 mm ±0.3 mm
6 – 30 ±0.1 mm ±0.2 mm ±0.5 mm
30 – 120 ±0.15 mm ±0.3 mm ±0.8 mm
120 – 400 ±0.2 mm ±0.5 mm ±1.2 mm
400 – 1000 ±0.3 mm ±0.8 mm ±2 mm
1000 – 2000 ±0.5 mm ±1.2 mm ±3 mm

What ISO 2768-m does and does not cover

It applies only to dimensions that have no tolerance of their own. The moment you write ±0.02 next to a dimension, that number wins and ISO 2768 stops applying to it. This is the most misunderstood part of the standard.

Angular dimensions use the same classes: ±1° up to 10 mm, ±0°30′ from 10 to 50 mm, ±0°20′ from 50 to 120 mm, ±0°10′ from 120 to 400 mm, and ±0°5′ above 400 mm.

Chamfers and external radii get their own, wider band: ±0.2 mm up to 3 mm, ±0.5 mm from 3 to 6 mm, and ±1 mm above 6 mm. Do not expect a chamfer to line up to a general linear tolerance.

It does not cover fits such as H7/g6, thread tolerances, surface roughness or GD&T. Those always need their own callout, whatever the title block says.

What each process holds

Tolerance is not one number for the whole shop — it depends on how the feature is made.

  • CNC milling — ±0.01 mm on critical features, ±0.005 mm where geometry allows, in a 1000 × 600 × 500 mm envelope.
  • CNC turning — ±0.01 mm, roundness to 0.005 mm, up to Ø 300 mm.
  • 5-axis machining — ±0.01 mm with up to five faces in one setup, which removes the stack-up you get from re-fixturing.
  • Wire EDM — ±0.01 mm standard, ±0.005 mm with skim passes.
  • Grinding — ±0.002 mm on ground features, for parts held below what milling and turning can reliably repeat.

How to put tolerances on your drawing

Small decisions on the drawing that cut hours off the machine time.

Precision wire-cut steel die components with sharp internal corners and fine tapered profiles

Frequently asked questions

The questions engineers ask us before they send a first drawing.

What tolerance do you hold if my drawing does not say?

ISO 2768-m. That means ±0.1 mm on dimensions up to 3 mm, ±0.2 mm from 6 to 30 mm, and ±0.3 mm from 30 to 120 mm, widening with size. If that is too loose for a feature, give the feature its own tolerance and we will quote to it.

It is possible and it is expensive. Holding it on every dimension means extra finishing passes, slower feeds, temperature control and full inspection. Most parts need it on two or three features — mark those and let the rest run to ISO 2768-m.

No. A tolerance you do not need adds cost without adding function, and on thin or large parts it can make the part harder to hold true. The useful question is what the feature has to do, not how tight we can go.

Cost jumps at three points. Below ±0.01 mm you pay for a finishing pass and in-process measurement. Positional tolerances between faces usually need a second setup or a 5-axis machine, and every setup adds handling and a new datum. A full dimensional report adds CMM time, which is why many customers ask for first-article only.

Yes, on request. Every part is inspected against your drawing before shipment, and dimensional reports and material certificates are prepared when the project needs them. Tell us at quote stage so we can build the documentation into the schedule.

Yes. We machine and inspect to the datums and geometric tolerances on your drawing — flatness, perpendicularity, position, runout. Where a feature carries no geometric callout, ISO 2768-2 general tolerances apply by default.

Where tolerance starts costing money

Tolerance is not priced linearly. Cost jumps at three points.

1. Below ±0.01 mm. The feature needs a separate finishing pass, slower feeds, more frequent tool changes, and measuring while the part is still on the machine.

2. Positional tolerances across faces. Holding two faces relative to each other usually means a second setup or a 5-axis machine. Every extra setup adds handling time and a new datum, and each datum brings its own error.

3. Full documentation. A dimensional report for every part means CMM time on every part. Asking for first-article inspection plus a spot check on the rest usually gives the same assurance for a fraction of the cost.

Ready to Start Your Project?

Send drawings in STEP, IGES or DWG. You get a priced quote within 48 hours in the normal case, with tolerance and lead time stated up front.

Where the part has to measure as well as fit — fixtures, gauge bodies, instrument panels — see CNC machining for test and measurement.